Fiber: A Fortune 500 Company Installs Pre-terminated Fiber Optic Patch Panels
Published by Cablesys on Dec 6th 2021
Green Bay, Wisconsin - IT staff at a Fortune 500 company that provides marketing and business communications deployed sixty OM3 fibers to support their 10G network. They decided to do the installation themselves using Cablesys’ Pre-terminated Patch Panel System.
Cablesys helped by building the materials; two 60-port LC patch panels with 100 feet OM3 fiber optic non-conductivity plenum cable assemblies. Cablesys bundled and labeled the cables to make routing and identification easy.
Their staff installed the patch panels in separate rack locations. They connected them together from the rear by snapping in the cable assemblies. No on-site termination was required.
To learn more, please visit Pre-terminated Fiber Optic Patch Panel System.